Service notice information
Kitchener - Doon campus Atrium and Student Life Centre closed: July 30, 2024, to June 2025
The Atrium and Student Life Centre located on levels 1 and 2 of the A-Wing at the Kitchener - Doon campus will be closed for renovations from Tuesday, July 30, 2024, until the end of June 2025. This will affect all access to the Atrium and both levels of the Student Life Centre corridors. Access to the Venue and Tim Hortons will be accessible and will not be affected by this renovation. Construction is expected to be noisy at times.
Conestoga Skilled Trades Campus driveway traffic change: January 2025 to summer 2026
The driveway in front of the Conestoga Skilled Trades Campus on Reuter Drive in Cambridge is changing back to one-way traffic in order to implement a pedestrian walkway. These changes will remain in place for the duration of Phase 2 construction into summer 2026.
Kitchener - Downtown campus permanent entrance changes: February 3, 2025
The King Street/Frederick Street mall entrance will be permanently closed, effective Monday, February 3. All users accessing services in this building should enter the main Conestoga entrance at Duke Street and Frederick Street (49 Frederick St.). This is to support a request from the external property managers.
Waterloo campus partial parking lot closure: April 29, 2025
A portion of the parking lot at the Waterloo campus will be closed on Tuesday, April 29 all day, starting at 7 a.m. The closure is necessary to perform a crane lift. An adjacent accessible parking spot near the fencing will remain open and accessible for patrons.
Waterloo campus scheduled power shutdown: April 24, 2025
A power shutdown is scheduled for the Waterloo campus on Thursday, April 24 from 7 to 9 a.m., impacting classrooms 2B19 and 2D along the north corridor.
Submitting a service notice
Fill out the service notice form to report a change in service.